A specialist consultant overseeing every phase of AI data center development — from foreign investment and corporate setup to land, power, server design, trade, and government filings. The reliability of an insulator and the extreme speed demanded by computation, fused into a single physical foundation.

SCROLL
STRATEGIC PILLARS

Four strategic pillars
anchor
the project.

Investment, development, design, and partnerships. Four complex processes layered like the laminated structure of an insulator, integrated into one seamless, logical development pipeline.

01

Investment & Finance

INVESTMENT & FINANCE

We receive investment from foreign enterprises and oversee everything from corporate establishment in Japan to financing design — structuring cross-border funding schemes and a corporate framework compliant with Japanese regulation.

  • Foreign investment scheme design
  • Corporate establishment & registration
  • Financing structure design
  • Tax & legal advisory
02

Land · Power · Due Diligence

LAND · POWER · DUE DILIGENCE

We select and develop sites suited to AIDCs, coordinate power procurement, and conduct rigorous due diligence tailored to the specific requirements of AI data centers.

  • Site selection & development
  • Power grid & contract coordination
  • AIDC-focused due diligence
  • Environmental & location assessment
03

Server Design & Trade

SERVER DESIGN & TRADE

From server design for AI data centers to international trade — end to end. With the concreteness of hardware and real execution power, we deliver development that goes beyond ordinary consulting.

  • AIDC server architecture design
  • GPU & accelerator selection
  • Procurement & trade logistics
  • Quality & standards management
04

Partnerships & Permits

PARTNERS & PERMITS

We recruit participating enterprises and handle all government filings. Through dialogue with authorities, we guide the project to a legally certain landing.

  • Partner enterprise recruitment
  • Licensing & application handling
  • Administrative negotiation
  • Subsidy & incentive utilization
碍子の釉薬テクスチャ

INSULATOR · RELIABILITY

Transforming extra-high-voltage power into vast future information

AIDC BLUEPRINT

The concreteness of hardware
is proof of execution.

By demonstrating the reality of trade and server design, we show development capability beyond the conceptual. A compute foundation optimized for AI workloads, designed end-to-end from procurement to deployment.

GPU cluster density

Top-tier

0K

GPU/rack

Rack power density

Top-tier

0kW

/rack

PUE target

Target

0.00

Design index

Latency

Reference

0.0μs

Inter-node

サーバーラックの光の回廊

// AIDC_NODE_CONFIG.yaml

cluster: ai-inference-edge

gpu: H200-SXM / 8 nodes

interconnect: NVLink 3.0

cooling: liquid-immersion

power: 120kW / rack

redundancy: 2N+1

uptime_tier: III

→ deploy.status: READY

SERVER · INFRA · TRADEHOVER → SPECS
SCENARIO HUB

From two entry points,
estimate required scale and capital.

DEMO— unlocked with a consulting contract

Choose between "Power Environment" and "Target GPU & Rack Config." Based on the selected entry point's inputs, required racks, GPUs, power, land, investment, and projected annual revenue are calculated automatically.

POWER ENVIRONMENT INPUT

Demo view — unlocked with a consulting contract

Currently showing a 100 MW / 30,000 m² reference example. A consulting contract is required to input and estimate with your own conditions.

Request a consultation →
Upper limit per grid connection study
100MW
0500
Development site
30,000㎡
1,000150,000
Number of stories
1
110
Building footprint vs. site area
60%
1090
Total floor area vs. site area
200%
501,000

Effective IT Power / Constraint

100.0 MW / 電力

Select CAPEX breakdown — rack density follows
ESTIMATED REQUIREMENTS
Required Racks

4,500

Racks

Required GPUs

36,000

GPUs

Required Power

90.0MW

Power

Required Land

22,500㎡

Land

Floors

1

Floors

Floor Area

18,000㎡

Floor Area

Required CAPEX

247,500M¥

CAPEX

Contract (+10% margin)

99.1MW

Contract

CAPEX per rack 55 M¥ (H100/H200 8GPU · building + IT) — applied config selected above.

Projected Annual Revenue

43,200M¥

* Approximate reference value. Actual plans are quoted separately based on individual conditions.

INVESTMENT SIMULATOR

Instantly visualizeinvestment profitability.

Linked to the rack count and required investment from the Scenario Hub above, annual revenue, ROI, and payback period are calculated automatically. Rack price, OPEX rate, and PUE can be adjusted below.

INPUT PARAMETERS

* Rack capacity, required investment, and power environment are linked to the ESTIMATED REQUIREMENTS in the Scenario Hub above.

Rack Capacity (linked)
4,500racks
Required Investment (linked)
247,500M¥
Effective IT Power (linked)
100.0MW
80万円/rack
40%
1.30
PROJECTED OUTPUT

Rack Capacity

4,500racks

Annual Revenue (proj.)

43,200M¥

Annual Operating Profit

25,920M¥

Annual Energy Use

1,024,920MWh

Investment (linked)247,500M¥
ROI (annual)10.5%
Payback Period9.5yrs
Assumed server & semiconductor config / CAPEX breakdown
Rack power density 5–20 kW
Intel Xeon / AMD EPYC general-purpose CPU, NVIDIA L4/L40S inference serversUse / General cloud & inference workloadsCAPEX/rack 30 M¥ (Building 12 + IT 18)
Rack power density 20–40 kWActive
NVIDIA H100 / H200 (8GPU/rack) AI training serversUse / LLM training & fine-tuning (air-cooled)CAPEX/rack 55 M¥ (Building 15 + IT 40)
Rack power density 40–100 kW
NVIDIA B200 / HGX B200 (liquid-cooled hybrid), 8–16 GPU/rackUse / Large-scale LLM training & multimodal AICAPEX/rack 130 M¥ (Building 20 + IT 110)
Rack power density 100–150 kW
NVIDIA GB200 NVL72 next-gen liquid-cooled rack (72 GPU/rack)Use / Frontier-grade AI infrastructure, full liquid coolingCAPEX/rack 350 M¥ (Building 30 + IT 320)

CAPEX/rack = building, power & cooling infrastructure + IT servers/GPUs. The config selected in the Scenario Hub above is applied to the investment.

* Values are approximate and vary with GPU generation, cooling method, location, and procurement conditions. A formal feasibility study is provided during consultation.

Request a detailed feasibility study →
SCALE VISUALIZER

Grasp thescaleof development by eye.

Just move the AIDC power capacity and rack count, required building area, energy use, and CO2 equivalent update visually. An interactive experience to intuitively grasp the scale of investment.

100MW
Power Contract Capacity100 MW

* Linked to the "Power Contract Capacity" input in the Scenario Hub.

Server Rack Layout Image3,333 racks

Rack count scales with power capacity. Each cell represents a cluster of server racks.

SCALE COMPARISON
Rack Capacity
3,333racks

30 kW/rack assumed

Required Building Area
16,665㎡

0.36× Tokyo Dome

Annual Energy Use
1,138,800MWh

325,371 households' worth

CO2 Equivalent Emissions
455,520t-CO2/年

Thermal-power reference

Household Equivalent
325,371世帯分

3,500 kWh/household/yr

* Values are approximate, based on 30 kW/rack density and PUE 1.3. They vary with location, cooling, and GPU configuration.

CONTACT

Set the project
in motion.

Foreign investment, site selection, server design, government filings — start from any domain. First, tell us your vision.

Tokyo, Japan
COMPANY

Company InformationCompany Information

Trade Name

/ Trade Name

GL-ARC,Inc.

Address

/ Address

8F-No1.NiikuraBldg,1-7-4,Akasaka,Minato-ku,Tokyo,107-0052,JAPAN

Representative

/ Representative

Representative Director, Takahiro Kiyosue

Inquiry

/ Inquiry
+81-3-6434-0705

Email

/ Email
info@gl-arc.com

LOCATION

1-7-4 Akasaka, Minato-ku · No1 Niikura Bldg. 8F

GL-ARC

GL-ARC

AI DATA CENTER DEVELOPMENT CONSULTANT

A bridge between energy and artificial intelligence. A Japan-born specialist consultant handling the entire AIDC development process end-to-end.

COMPANY

GL-ARC,Inc.

株式会社ジーエルアーク

〒107-0005
東京都港区赤坂1-7-4 No.1ニイクラビル8F
03-6434-0705info@gl-arc.com

代表取締役 清末隆宏

© 2026 GL-ARC,Inc. — ALL RIGHTS RESERVED

GL-ARC,Inc.